What to Ask a Cabinet Refacing Contractor

A cabinet refacing contractor should be able to tell you, before any door is ordered, whether your boxes can stay. Refacing replaces the doors, drawer fronts, and hardware on cabinets that are still sound. It is not a new kitchen, and it is not a coat of finish on the doors you already own. If the boxes are loose, wet, or made of a material that will not hold a new front, new doors will not fix the kitchen.

Transform your space today with a free on-site or eligible virtual estimate. A written proposal follows once the boxes, fronts, and finish are reviewed.

Homeowners in Oakland County and Macomb County often start with a pretty door sample and a round number. The better start is a short list of questions. Ask what stays, what is replaced, how the finish is built, and what the warranty actually covers. A general guide to choosing the right contractor covers reviews and first impressions. This one stays on the cabinet boxes. Top Shelf Painting & Improvement Specialists has done this work across Metro Detroit since 1998. The checks below are the same ones a careful crew uses on a first visit.

What a cabinet refacing contractor should inspect first

Start at the box, not the door. A refacing job keeps the cabinet case and changes the parts you see and touch. If the case is the weak part, you are paying to dress up a cabinet that still needs to be rebuilt.

Boxes, hinges, and moisture

Open every door and pull every drawer. Look for soft wood under the sink, swollen ends beside the dishwasher, and shelves that sag in the middle. Press the face frame. A frame that moves when you push it will still move after a new door is hung. Hinge screws that will not tighten are a warning that the stile is stripped or split.

Water is the hard stop. A door can be replaced. A box that has wicked up a long leak often cannot hold new hinges or a new veneer. Say so early. A contractor who promises every kitchen can be refaced, without looking under the sink, is selling a result they have not earned.

When refacing is the wrong job

Refacing fits cabinets that are sturdy and laid out the way you cook. It is a poor fit when you need new appliance openings, a different island, or boxes that have already failed. In that case, replacement is the honest path. If the doors are solid and you mainly want a new color, cabinet refinishing may be the better scope, because it keeps those fronts. The choice between the two is a condition and design question, not a slogan. Read the refinishing versus refacing comparison before you ask anyone for a single price.

How to read a cabinet refacing proposal

A useful proposal names the work. A thin one names a style and a total. Ask for the line items below in writing. If two contractors will not put the same items on paper, you are not comparing the same job.

Read each row as a yes or no. The middle column is the wording you want on the page. The last column is the dispute that wording prevents.

Proposal line What it should say Why it matters
Boxes that stay Which runs are refaced. Which boxes are excluded or rebuilt. Stops a later surprise at the sink or pantry.
Doors and drawer fronts Material and style. State whether every front is new. Solid wood and a pressed panel are not the same product.
Frames and end panels Veneer, paint, or left as-is. Call it out by elevation. A new door on an old oak frame looks unfinished.
Hardware and hinges Who supplies pulls. Whether holes are filled. Hinge type. New hole patterns are extra work, not a free detail.
Finish system Primer and topcoat. Say whether doors are finished off site. Kitchen steam and cleaners punish a thin coating.
Site protection and cleanup Floors, counters, and appliances. Daily debris removal. You still live in the room while boxes are coated.
Warranty Term. Which failures are covered. Which substrates are excluded. A year count without exclusions is not a promise you can use.

Price comes after the scope, not before it. Public ranges are planning aids. The number you can rely on is the written proposal for your kitchen, after someone has seen the boxes. Do not treat a per-door average from a national directory as your budget.

Compare two bids on the same boxes

Lay the proposals side by side and mark any line one of them skipped. A lower total often omits end panels, light-rail covers, or the filler strips beside the fridge. It can also assume you keep the old hinges. Those omissions show up later as change orders, after the old doors are already gone.

Ask each contractor to price the same door count, the same veneer on the visible ends, and the same hardware plan. If one bid includes shop finishing and the other finishes doors in the kitchen, the totals are not comparable. Note who measures. A proposal built from your own count of doors, without a site check, is a guess. The final count should be theirs, written down, before you pay a deposit.

Door material, finish, and hardware

The door is the part you will judge every morning. Ask what it is made of, not only what color it is. In a Metro Detroit kitchen, bathroom, or laundry, moisture is normal. A front that swells at the dishwasher will telegraph through any coating.

Solid wood versus a pressed panel

Ask whether the new doors and drawer fronts are solid wood or a fiber product such as MDF or HDF. Fiber panels are common because they are flat and cheap. They also move when they stay wet. Top Shelf uses solid-wood replacement doors and drawer fronts on refacing projects for that reason. Confirm the same fact in any other proposal. A sample chip does not tell you what is inside the door.

What gets coated, and where

New fronts still need a finish that can live next to steam, oil, and alkaline cleaners. Ask where that finish is applied. Doors and drawer fronts that are cleaned, sanded, primed, and topcoated in a controlled shop cure more evenly than parts finished on a dusty countertop. Boxes usually stay in the kitchen. They should still be cleaned, scuffed, primed, and topcoated, with openings covered while the crew works. The cabinet refacing process shows how that sequence is staged so the house is protected.

Hinges and pulls

Bring the hardware decision into the estimate. A new door style often needs a new hinge and a new hole pattern. Filling old holes and drilling new ones is labor. If you want to reuse pulls, say so before the fronts are built. Soft-close hinges are a product choice, not a default you should assume is in the price.

Questions to ask before you hire

Use these questions on the first visit. A clear contractor can answer them without a brochure. Write the answers into the proposal so the crew that shows up is held to the same plan.

  1. Which boxes stay, and which ones are too damaged to reface?
  2. Are the new doors and drawer fronts solid wood, and can you say so in the proposal?
  3. Will frames, end panels, and light-rail covers be veneered or coated to match?
  4. Where are the doors finished, and how many coats of primer and topcoat are specified?
  5. Who protects floors, counters, and appliances, and who hauls away the old fronts?
  6. Are you licensed and insured in Michigan, with certificates available on request?
  7. If the house was built before 1978, how will you handle lead-safe work on painted surfaces?
  8. What does the written warranty cover, and which materials are excluded?

Insurance is not a slogan. Ask for general liability and workers compensation certificates you can send to your insurer if you want. Employee crews and day labor are different risks. You want to know who is in the kitchen.

Lead-safe work in older homes

Many Oakland and Macomb kitchens were built before 1978. Painted wood from those years can contain lead. The U.S. Environmental Protection Agency requires firms that are paid to disturb painted surfaces in pre-1978 homes, childcare facilities, and preschools to be certified, with workers trained in lead-safe practices. That rule is the Renovation, Repair and Painting program. Refacing that pulls painted doors or sands painted boxes can disturb that paint. Ask the contractor how they will contain dust if your home falls in that group. A firm that shrugs the question off is not ready for the house.

Protection, cleanup, and the walkthrough

Refacing is dusty even when the new doors are finished somewhere else. Boxes are cleaned and scuffed in your kitchen. Old doors leave the house. Hinges are cut in. A careful crew covers floors and nearby surfaces before tools come out, covers cabinet openings while boxes are coated, and removes paper, coverings, and debris before they leave.

Put cleanup in the scope. “Broom clean” means different things to different crews. Ask whether they wipe counters, vacuum the cabinet interiors, and haul the old fronts the same day. Then plan a final walkthrough with the person who can approve a touch-up. Look at end panels in raking light, check that every drawer slides square, and confirm hardware is tight. Small gaps in that list become the punch work nobody scheduled.

Scheduling should stay honest. A start date depends on door lead time, shop capacity, and what the estimate found. Do not accept a guaranteed week from a contractor who has not measured the fronts. Top Shelf confirms timing in the written proposal after the visit, not as a blanket promise on a webpage.

What you should move before the crew arrives

Clear the counters and the tops of the upper cabinets. Take down small appliances, knives, and anything hung on the doors. The crew should not have to guess which dishes can be shifted. If a fridge must be pulled to veneer the panel beside it, ask that question during the estimate so the water line and the floor are planned for.

Pets and small children need a closed room while boxes are scuffed and coated. Coatings have a cure window. Ask which cabinets you can use at the end of each day, and which doors must stay off until the shop finish is ready to hang. That schedule belongs in the proposal, next to the protection notes, so the crew and the household are working from the same plan.

Warranty language worth reading twice

Ask for the warranty page that matches your scope, then read the exclusions. A long term on “cabinet coatings” can mean something different from a workmanship warranty on refinishing. Top Shelf’s cabinet warranty is limited, non-transferable, and tied to the contracted customer and the surfaces named in the work order. It does not cover every substrate. Previously coated, laminate, thermofoil, and melamine cabinets are called out as exclusions on the cabinet warranty page. Wood movement and cracks that come back are also outside a typical finish warranty.

That is the standard you should apply to any cabinet refacing contractor. If laminate or thermofoil is what you have, ask whether those boxes are even eligible before you fall in love with a door sample. If the warranty is “lifetime” with no exclusions, ask what fails, who pays labor, and whether a later owner is covered. Get the answer in the proposal. A verbal year count will not help you in year three.

When you want that review done in your own kitchen, see how cabinet refacing is scoped and schedule the estimate. Transform your space today once the boxes are confirmed sound.

Frequently asked questions

What does a cabinet refacing contractor replace?

They replace the doors, drawer fronts, and usually the hinges and pulls, and they refinish or veneer the frames and end panels that stay. The cabinet boxes remain. If a box is rotten, loose, or the wrong size for the appliance, that box is a repair or a replacement, not a reface.

How is refacing different from refinishing?

Refacing gives you new fronts and hardware. Refinishing keeps suitable existing doors and fronts and renews the finish. Condition, substrate, and the look you want decide which one is eligible. Neither one is a full kitchen remodel.

Can every cabinet be refaced?

No. Solid, dry boxes with a layout you want to keep are the usual candidates. Particle boxes that have swollen, frames that rack, and some laminate or thermofoil products need a different plan. A contractor should decline the job, or price the bad boxes separately, rather than promise a uniform result.

Should I ask about lead paint?

Yes, if the home, childcare space, or preschool was built before 1978 and the work will disturb painted surfaces. Paid firms must follow the EPA lead-safe rule for that work. Ask who is certified and how dust will be contained. Newer homes are a different case, but the question still shows whether the contractor knows the rule.

Do I need a site visit before I hire?

Yes, or an eligible virtual review that still ends in a written scope. Photos can start the conversation. They cannot confirm a soft sink base, a stripped hinge stile, or a frame that is out of square. The proposal you sign should match what was actually inspected.

Posted in